能看黄色电影的网站-嗯嗯嗯 天天干-你懂的91午夜福利视频-你去二区三区3D动漫-柠檬福利第一导航在线-妞操网

Current Location:Home > Product > IF induction series > IF power supply

2018-10-26 10:13:27

Share
  • Share to WeChat Moments

RAZ-400KW intermediate frequency power supply---+---furnace shelf (combination)

  • Description

Induction Heating Power Supply--Safety Operation Guide


1. Before starting the machine, first check whether the water, gas and electricity are connected. After connecting, the following operations can be performed;

2. The operator must prepare corresponding insulating shoes, gloves, etc.

3. The operator must have the corresponding electrical knowledge.

4. Before the equipment is overhauled, the electric switch must be pulled off to confirm that the power supply is disconnected, and then the discharge treatment is carried out, and then the overhaul card is hung up, and the overhaul is repeated.

5. Before starting the machine, first make sure that the waterway is normal and all parts of the equipment are normal before starting the machine.

6. Turn on the first gear filament first, then turn on the second gear filament after five minutes, and then send the high voltage after another five minutes.

7. Before sending high voltage, make sure that the output adjustment potentiometer is in a small position, and then send high voltage, and adjust the output voltage to the working voltage.

8. After confirming that there is a workpiece, you can press the heating button to make the equipment work, but no-load heating is not allowed.

9. If there is an abnormality in the equipment during work, the power supply must be disconnected immediately, and the reason should be checked before working again.

10. After the equipment is finished working, first disconnect the heating, then disconnect the high voltage, then turn off the filament and disconnect the power supply.

11. After the equipment stops working, wait for five minutes before disconnecting the water source.

12. During the operation of the equipment, if there is a temporary need to leave, it must be done. People leave the machine and stop it. It is not allowed. The machine is still working when there is no one.


weekly maintenance

1. When taking over the shift, check the flow of the cooling water outlet pipe of the equipment for abnormal phenomena. For equipment that uses evaporative cooling tubes, it is necessary to check whether the water level of the distilled water tank is qualified;

2. When taking over, check whether the cooling air volume of the glass shell and core column of the electronic tube and other ventilation and heat dissipation facilities are normal;

3. Check whether the contacts of each AC contactor are ablated and whether the wiring is loose;

4. Measure the insulation resistance of cooling water. The ground resistance of the anode of the water-cooled tube should be greater than 300K ohms;

5. The cooling water pipes of the electronic tube grid and the filament are mostly rubber tubes, which are easy to age and should be carefully checked. For the rubber tube that is aging and about to break, it should be updated in time;

6. Do a cleaning and dust removal on the inside of the chassis, wipe off the dust of each high-pressure porcelain bottle and insulating pillars, and pay attention to the cleaning of the dust filter on the air inlet of the fan. Prevent the air intake from being blocked and reduce the air output.


Semi-annual maintenance

1. Check whether the insulation performance of the low-voltage electric control circuit is qualified;

2. Use a megohmmeter to detect the insulation resistance of high-voltage devices such as high-voltage rectifier transformers, high-voltage cables, and high-voltage silicon stacks, and the value should meet the requirements;

3. Check the roundness of the inner tube of the water jacket of the electronic tube and the height of the positioning protrusion, so as to prevent the partial overheating of the anode caused by the deviation of the tube. And check whether there is scaling at the water jacket outlet and inlet pipe joints, and whether the anti-corrosion electrode is normal; 4. Check the set current value of each overcurrent relay;

5. For connecting conductors with high temperature during operation, such as filament lead wires, soft connecting wires for welding transformer primary coils, etc., if there is poor oxidation contact, additional treatment should be made;

7. Thoroughly clean the hidden places such as the top of the cabinet and the cable trench.


Link to this article:http://www.bkasjsw.cn/en/product/product20181026142.html
Previous:NO!
Next:NO!

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 国产精品自在线拍国 | 色综合婷婷在线观看66 | 伦人伦xxx国产对白 国产第一页屁 | 香港三级日本三级韩国三级 | 美女裸身网站免费看免费网站 | 亚洲日本在线看片 | 国产天堂精品 | 丝袜亚洲日韩另类 | 成人精品视频一区二区三区不卡 | 草逼视频网站 | 国产精品一级在线观看 | 国产精品俺来也在 | 国产亚洲精品不卡在线 | 热映电影免费在线观 | 免费成年人影片 | 高清午夜福利电影在线 | 免费观看最新电影和热门影视剧 | 午夜欧美国产一区 | 最新日韩欧美不卡一二三 | 欧美精品在线观看 | 日本在线不卡免费视频一区 | 亚洲综合另类小说色六月 | 最新国产精品 | 新版资源天堂中文 | 亚洲国产第一区二区香蕉 | 日本搞黄在线观看 | 亚洲欧美日韩国产精品一区第一页 | 亚洲国产99在线精品一区 | 玖玖玖视频在线观看视频6 日韩精品搭讪在线视频播放 | 国产精品高清一区二区三区 | 国产综合精品五月天喷水 | 天天夜夜欢性恔免费视频 | 国产又黄又大又爽视频 | 成都在线观看免费观看 | 影院在线播放 | 日本护士 | 视频免费1区二区三区 | 成人免费看片又大又黄 | 精品国产欧美 | 国产精品xxxx | 91精品导航在线观看 |