能看黄色电影的网站-嗯嗯嗯 天天干-你懂的91午夜福利视频-你去二区三区3D动漫-柠檬福利第一导航在线-妞操网

Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

2020-07-21 16:25:04

Share
  • Share to WeChat Moments

Infrared temperature measurement forging furnace

  • Description

Operation steps of infrared temperature measurement forging heating furnace

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of Forging Furnace with Infrared Temperature Measurement

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg



Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 国产欧美日韩在线一 | 后进极品翘臀在线播放 | 高清线视频 | 美女视频性感网站 | 日韩一二三区免费视频 | 国产原创露脸视频在线观看 | 日韩欧美不卡视频中文字幕 | 另类图片| 好吊妞视频988在线播放 | 日本中文字幕乱码aa高清电影 | 国产999精品视频 | 欧美系列国产系列一二三四 | 99在线精品免费视 | 91视频在线 | 99热婷婷国产精品综合 | 日韩精品在线一区二区 | 国产人妖视频一区二区 | 国产亚洲精品aaa大片 | 日本三级韩国三级香港三级a级 | 天美麻花果冻苏蜜清歌 | 99精品电影一区二区免费看 | 精品国产品香蕉在线观看75 | 天堂mv亚洲mv在线播放9蜜 | 日本一区二区三区在线观看网站 | 国产日产欧产精品精品首页 | 精品国产日韩在线观看 | 91精品国产一区二区三区左线 | 国产激情在线观看免费视频 | 九九在线免费 | 欧美一级a视频免费放新闻 欧美午夜一区二区之蜜桃 门卫老头吮她 | 国产在线精品观看一区欧美 | 综合乱伦自拍三 | 欧美日韩国产免费一区二区三区 | 国产传媒在线观看 | 国色天香 | 日韩欧美一区二区三区免费 | 午夜三级中文在线观看 | 人片在线观看 | 国产手机| 不卡一区二区三区卡 | 国产超级va在线播放 |